Flat handover checklist

Everything to check before you take the keys from the builder, with how to check it. Tick it off on your phone, mark problems, then print it or send the snag list.

0 of 71 checked0 problems

Your ticks and notes stay in this browser on this device. Paste the problem list into WhatsApp or an email to the builder.

Before the visit

0/10

Papers to collect or ask for. Take copies; keep the originals safe.

On the builder's letterhead with the flat number, date of possession and signatures.
Ask for a copy. Without an OC, water, power and resale can be difficult.
Registered, with the schedule of the flat, its carpet area and the parking slot.
Note the carpet area in the agreement; you will measure against it.
And the bank's letter if the builder's project loan is released for your flat.
Maintenance agreement, the deposit and monthly rate, association membership form, house rules.
Khata transfer status, the latest tax receipt, and who pays tax up to the handover date.
Write down the meter numbers and the first readings, and ask when the connections move to your name.
For lift, fittings, sanitaryware, geyser, water purifier, modular kitchen, chimney, any appliance supplied.
Count the keys for every door and lock (main door, bedrooms, balcony, letterbox, meter box) and note the number.

Measurements

0/3

Carry a tape and, if you can, a laser meter, and the floor plan.

Measure every room wall to wall, add them up (with balconies listed separately) and compare with the agreement.
Usually 2.75 to 3 m floor to ceiling. Check a few rooms; note beams and drops.
Bedrooms, kitchen and toilets, and the width of passages and doors.

Main door and doors

0/5
Doors close without rubbing, stay where you leave them, and do not swing open by themselves.
Every lock works with every key, from both sides. The main door has a safety chain or viewer if promised.
No sagging or squeaks; all screws in place.
Even gaps around the shutter; a small gap at the bottom of toilet doors only.
Door stoppers fixed so handles do not hit the wall.

Windows and balcony

0/6
Open and close each shutter fully; the rollers should not jump or grind.
Every window and balcony door locks properly.
Continuous silicone inside and outside; no gaps where rain can come in.
No scratches, cracks or chipped edges; look at it against the light.
At least 1 m high (measure), and firm when you push it. Gaps small enough that a child cannot slip through.
Pour a bucket of water: it should run to the drain and leave no puddles.

Walls and ceiling

0/5
Hairline plaster cracks are common and can be filled; wider or diagonal cracks near doors and beams need the builder's engineer.
Look for patches, bubbles or peeling paint, especially on walls next to toilets, the kitchen and external walls.
Tap the walls with a coin or your knuckle; a hollow sound means the plaster has come away.
Even colour, no patches or brush marks, clean edges at the ceiling and around switches.
Hold a long spirit level or a straight edge against walls and corners; check the corners are square where wardrobes will go.

Floors and tiles

0/5
Tap every tile (a coin or a small rod works): a hollow sound means it was laid without enough bedding and may crack.
Check the edges and corners, and near doors.
Floors in rooms should be level (roll a marble or use a level); only toilets and balconies should slope, towards the drain.
Joints filled evenly, with no gaps or stains.
Fixed firmly, no gaps at the top, joints matched.

Kitchen

0/6
Put a level on the counter; check the granite joints and the edge polish.
Fill the sink and let it go: it should drain quickly with no leak underneath.
Open the taps fully; check the hot water line if one is provided.
Where the piped gas or cylinder point is, and that it is capped and tested.
A cut-out or point on an external wall, with a power socket near it.
Sockets for the fridge, microwave, mixer, water purifier and dishwasher; test with a tester, including the earth.

Bathrooms

0/7
Pour a bucket of water on the floor: it should all run to the drain, nothing towards the door.
Run the basin for a minute and look underneath with a torch.
Flush each WC a few times; it should refill fully and stop.
Check the mixer and hot water lines once the geyser is connected.
Look at the walls on the other side of the bathroom (bedroom, passage) for damp patches after you have run water.
Working, or a cut-out with a power point.
A 15 A socket at the right height and its switch outside or away from the shower.

Electrical

0/8

Carry a socket tester or a small lamp and your phone charger.

Try every switch, and every socket with a tester (it shows live, neutral and earth).
MCBs labelled room by room; no loose wires; the cover fits.
Press the test button: it should trip at once. Reset it after.
The tester shows earth on all 3-pin sockets; ask for the earth pit location.
A 16 A point, the copper pipe sleeve and a drain outlet for each AC location.
Which circuits are wired to the inverter or the building's backup, and the backup capacity per flat.
Conduits and points in the living room and bedrooms; ask which providers serve the building.
Working, and on the right circuit.

Plumbing

0/5
Open each tap fully: water comes at once, it does not drip when closed.
Check on the top floor and at the farthest bathroom.
Ask which tank serves your flat and how it is filled (borewell, municipal water, tanker).
Your flat's meter, its number and that it moves when you run water.
Run all taps and showers for ten minutes, then look at every joint, the ceiling below if you can, and the shafts.

Common areas and the building

0/7
Working, with a valid licence displayed and an alarm and phone inside.
Extinguishers, sprinklers or hydrants as approved, fire exit clear and signed, the fire NOC if required.
Your slot number matches the allotment letter and a car fits with the doors open.
Whether water is round the clock or at set hours.
What runs on backup (lifts, pumps, common lights, flats) and the load per flat.
Working, and who runs it.
Gate, intercom, cameras and staff as promised.

After you sign

0/4
With the room and a date; a short walk-through video helps later.
Email it (keep a copy) and ask for a date by which it will be fixed.
Check the fixes yourself before you start interiors work.
Under RERA the builder must fix structural defects and defects in workmanship, quality or services reported within 5 years of possession, at no cost.

Questions

When should I do the handover inspection?

Before you sign the possession letter or take the keys, in daylight, with water and power connected. Give it two to three hours for a 2 or 3 BHK. If the builder asks you to sign first, write "subject to snag list" next to your signature and attach the list.

What should I carry?

Your agreement and floor plan, a measuring tape (a laser meter is easier), a spirit level, a socket tester or a small lamp, a phone charger to test sockets, a coin or small rod to tap tiles, a torch, a bucket for the slope test, and your phone for photos.

How do I check for hollow tiles?

Tap each tile at its corners and centre with a coin or a small rod. A solid tile gives a dull, firm sound; a hollow one rings. Hollow tiles were laid without enough bedding and tend to crack later, so mark them on the list and ask for them to be relaid.

The carpet area I measured is less than the agreement. What now?

Measure again wall to wall, room by room, leaving out the walls themselves, and compare with the carpet area in the RERA agreement. Small differences of a percent or two are normal. For a larger shortfall, write to the builder with your measurements; the agreement and RERA set out what you are owed.

What if I find defects after moving in?

Under RERA, structural defects and defects in workmanship, quality or services that you report within five years of possession must be fixed by the builder at no cost, usually within 30 days. Report them in writing with photos and keep a copy.

Is my checklist saved?

Yes, in this browser on this device only. Nothing is sent to us. To keep a copy, use Print / save PDF, or copy the problem list into an email or WhatsApp.